MAR-01 Water Supply and Sewage Systems Rehabilitation LOT-1-2-3 and 6
common.category: Water Supply and Sewage Infrastructure

MAR-01 Water Supply and Sewage Systems Rehabilitation LOT-1-2-3 and 6

Contract Duration: 30 Month

Status: 2022 - Ongoing

Partner: China Geo-Engineering Corporation (CGC)

Project Scope:

  • Construction of 2X3000m 2 Reinforced Concrete reservoirs
  • PE Pipe laying 160 km
  • Corrugated Pipe: 130 km
  • D700mm and D600mm DCI pipe transmission line – 16,4 km
  • Construction of Pumping station with related mechanical and electrical works
  • 2 New Borehole Drilling
  • Rehabilitation of 17 Units of Existing Boreholes
  • Installation of water meters – 6400pcs
  • CCTV Inspection: 89km


Contract Type: FIDIC RED BOOK 1999

Financier: Asian Development Bank (ADB) and LLC United Water Supply Company of Georgia
(UWSCG)