Partner: China Geo-Engineering Corporation (CGC)
Project Duration: 2 Years (2021-2023)
Status: Defects Notification Period
Project Scope:
- Construction of 4 Units of Reinforced Concrete Reservoirs in total 6000m 3
- PE Pipe laying 84 km
- Construction of Vardiubani Pumping station with related mechanical and electrical works
- Rehabilitation of Vardisubani Exisitng Water Reservoir 7000m 3
- 3 Borehole Drilling (each: 200m depth)
- Installation of Water Meters – 1670pcs
Contract Type: FIDIC RED BOOK 1999
Financier: Asian Development Bank (ADB) and LLC United Water Supply Company of
Georgia (UWSCG)